Overdue
4
Past due date
Due Soon
4
Within 7 days
Scheduled
7
On schedule
PM Compliance
73%
On-time rate
| Task | Campus | Frequency | Assignee | Due | Status | |
|---|---|---|---|---|---|---|
HVAC Filter Replacement - All RTUs HVAC Rooftop Units (12) | Westlake Elementary | Quarterly | Mike Torres | Apr 3, 2026 5d overdue | Overdue | |
Playground Safety Inspection (CPSI) Playground K-2 Structure | Riverside Academy | Monthly | James Park | Apr 4, 2026 4d overdue | Overdue | |
AED Battery & Pad Check AEDs (6 units) | Park Ridge K-8 | Monthly | Nurse Rodriguez | Apr 6, 2026 2d overdue | Overdue | |
Emergency Lighting Test All Egress Lights | South County Elementary | Monthly | In-house | Apr 7, 2026 1d overdue | Overdue | |
Generator Load Test Emergency Generator - 150kW | Westlake Elementary | Monthly | Mike Torres | Apr 9, 2026 in 1d | Due Soon | |
Fire Extinguisher Inspection All Extinguishers (48) | Westlake Elementary | Monthly | Safety Team | Apr 10, 2026 in 2d | Due Soon | |
Kitchen Hood Cleaning Cafeteria Kitchen Hood | Northside Middle School | Semi-Annual | Hood Cleaners Inc | Apr 13, 2026 in 5d | Due Soon | |
Elevator Monthly Inspection Main Elevator | Northside Middle School | Monthly | ThyssenKrupp | Apr 13, 2026 in 5d | Due Soon | |
Roof Inspection - Full Visual All Roofing | South County Elementary | Semi-Annual | Roofing Contractor | Apr 18, 2026 in 10d | Scheduled | |
Pest Control Treatment All Buildings | Westlake Elementary | Monthly | Terminix | Apr 18, 2026 in 10d | Scheduled | |
Backflow Preventer Testing Water Service Lines | Park Ridge K-8 | Annual | Able Plumbing | Apr 23, 2026 in 15d | Scheduled | |
Fire Alarm System Test Fire Alarm Control Panel | Northside Middle School | Semi-Annual | Johnson Controls | Apr 28, 2026 in 20d | Scheduled | |
Parking Lot Striping Inspection All Parking Lots | Westlake Elementary | Annual | James Park | May 3, 2026 in 25d | Scheduled | |
Boiler/Water Heater Service Domestic Hot Water System | Riverside Academy | Annual | Able Plumbing | May 13, 2026 in 35d | Scheduled | |
HVAC Coil Cleaning All Air Handlers | Lakeview Campus | Annual | CoolTech HVAC | May 23, 2026 in 45d | Scheduled |